Pre-stressed Concrete Post with E12/35 Foundation (Additional Models Available). Please note that the "cup" for installing the prestressed concrete pole is sold separately.
Introducing the Hipar HIP-E9800-SSB, a top-tier pre-stressed concrete post tailored for the Ecorote 9800 turbine. This post includes an E12/35 foundation, ensuring a strong and stable base for your turbine installation. For information on other models and options, please refer to our catalog. Crafted by Hipar, the HIP-E9800-SSB is designed for exceptional durability and performance. The pre-stressed concrete is engineered to withstand the various stresses and environmental challenges typical of turbine operations, making it a dependable choice for wind energy applications. When installing the HIP-E9800-SSB on a pre-stressed concrete pole, it is crucial to use the specially designed "Cup," which is available separately. This component is essential for securing and stabilizing the post on its concrete foundation. Opt for the Hipar HIP-E9800-SSB for a reliable and sturdy foundation solution for your Ecorote 9800 turbine. Its premium construction and compatibility with diverse models make it a valuable asset to any wind turbine setup. מבית OWC – זמין בטאקט טכנולוגיות.
קטגוריה: all
לקבלת הצעת מחיר – צרו קשר.
השאירו פרטים ונחזור אליכם בהקדם
Tact technologies Solutions LTD פועלת בעולמות החומרה וה-IT למעלה מ-15 שנים עם מאות לקוחות מרוצים, מקטנים עד חברות וארגוני ענק.
החברה שמה על דגלה להעניק ללקוחותינו את שירות הלקוחות ברמה הגבוהה ביותר כך שיחד עם פתרונות התוכנה והחומרה הייחודיים שלנו אנו יוצרים שילוב מנצח עבור לקוחותינו שחלקם נמצאים איתנו מהקמת החברה.