E18/15 Reinforced Concrete Pole for Ecorote 5000 Turbine – This pole is 18 meters in length and has a load capacity of 15 kilonewtons. It comes with the necessary HIP-E5000-SSB-KIE cup included. The estimated delivery time is five weeks.
Introducing the Hipar STR-ZERDZ-WIROWANA-E18-15, a premium pre-stressed concrete column crafted specifically for the Ecorote 5000 turbine. With an impressive length of 18 meters and a robust load capacity of 15 kN, this column is designed to excel in supporting large wind turbines in challenging environments. Constructed from high-quality pre-stressed concrete by Hipar, the STR-ZERDZ-WIROWANA-E18-15 offers exceptional strength and durability. Its engineered design effectively manages the substantial weight and operational stresses associated with the Ecorote 5000 turbine, ensuring consistent and reliable performance over time. For installation, the HIP-E5000-SSB-KIE socket is necessary and must be purchased separately. This component is crucial for securely anchoring the concrete column, ensuring optimal alignment and stability of your turbine system. With a lead time of up to 5 weeks, the STR-ZERDZ-WIROWANA-E18-15 is a dependable choice for your Ecorote 5000 turbine installation, offering enduring support and structural integrity to enhance efficient wind energy generation. מבית OWC – זמין בטאקט טכנולוגיות.
קטגוריה: all
לקבלת הצעת מחיר – צרו קשר.
השאירו פרטים ונחזור אליכם בהקדם
Tact technologies Solutions LTD פועלת בעולמות החומרה וה-IT למעלה מ-15 שנים עם מאות לקוחות מרוצים, מקטנים עד חברות וארגוני ענק.
החברה שמה על דגלה להעניק ללקוחותינו את שירות הלקוחות ברמה הגבוהה ביותר כך שיחד עם פתרונות התוכנה והחומרה הייחודיים שלנו אנו יוצרים שילוב מנצח עבור לקוחותינו שחלקם נמצאים איתנו מהקמת החברה.