Introducing the Hipar STR-ZERDZ-WIROWANA-E18-15, a premium pre-stressed concrete column crafted specifically for the Ecorote 5000 turbine. With an impressive length of 18 meters and a robust load capacity of 15 kN, this column is designed to excel in supporting large wind turbines in challenging environments. Constructed from high-quality pre-stressed concrete by Hipar, the STR-ZERDZ-WIROWANA-E18-15 offers exceptional strength and durability. Its engineered design effectively manages the substantial weight and operational stresses associated with the Ecorote 5000 turbine, ensuring consistent and reliable performance over time. For installation, the HIP-E5000-SSB-KIE socket is necessary and must be purchased separately. This component is crucial for securely anchoring the concrete column, ensuring optimal alignment and stability of your turbine system. With a lead time of up to 5 weeks, the STR-ZERDZ-WIROWANA-E18-15 is a dependable choice for your Ecorote 5000 turbine installation, offering enduring support and structural integrity to enhance efficient wind energy generation.

E18/15 Reinforced Concrete Pole for Ecorote 5000 Turbine – This pole is 18 meters in length and has a load capacity of 15 kilonewtons. It comes with the necessary HIP-E5000-SSB-KIE cup included. The estimated delivery time is five weeks.

Introducing the Hipar STR-ZERDZ-WIROWANA-E18-15, a premium pre-stressed concrete column crafted specifically for the Ecorote 5000 turbine. With an impressive length of 18 meters and a robust load capacity of 15 kN, this column is designed to excel in supporting large wind turbines in challenging environments. Constructed from high-quality pre-stressed concrete by Hipar, the STR-ZERDZ-WIROWANA-E18-15 offers exceptional strength and durability. Its engineered design effectively manages the substantial weight and operational stresses associated with the Ecorote 5000 turbine, ensuring consistent and reliable performance over time. For installation, the HIP-E5000-SSB-KIE socket is necessary and must be purchased separately. This component is crucial for securely anchoring the concrete column, ensuring optimal alignment and stability of your turbine system. With a lead time of up to 5 weeks, the STR-ZERDZ-WIROWANA-E18-15 is a dependable choice for your Ecorote 5000 turbine installation, offering enduring support and structural integrity to enhance efficient wind energy generation. מבית OWC – זמין בטאקט טכנולוגיות.

קטגוריה: all

לקבלת הצעת מחיר – צרו קשר.

קטגוריה:

מוצרים דומים

HPE J4858D – Aruba 1G SFP LC SX 500m OM2 MMF Transceiver - טאקט טכנולוגיות
טאקט - פתרונות טכנולוגיים מתקדמים לציוד IT ותקשורת

Contact

השאירו פרטים ונחזור אליכם בהקדם

מחפשים ציוד IT? קבלו הצעת מחיר תוך 24 שעות! בקשו הצעת מחיר 03-7524441 ×
דילוג לתוכן