Introducing the Reinforced Concrete Pole specifically designed for the Ecorote 9800 Turbine, model E16.5/25 (308). This pole measures 16.5 meters in length and offers a substantial load capacity of 25 kN. You can expect a delivery timeline of approximately 5 weeks. Additionally, it includes the HIP-E9800-SSB-KIE cup, which is required for installation.
Introducing the Hipar STR-ZERDZ-WIROWANA-E16.5-25, a top-tier pre-stressed concrete column designed specifically for the Ecorote 9800 turbine. Measuring 16.5 meters in length and capable of supporting a significant load of 25 kN, this column is built to sustain large-scale wind turbine installations with ease.
Produced by Hipar, the STR-ZERDZ-WIROWANA-E16.5-25 incorporates cutting-edge pre-stressing technology to ensure outstanding strength and resilience. Designed to withstand hefty loads and harsh environmental challenges, this column enhances the stability and efficiency of your wind turbine system.
With a manufacturing lead time of up to 5 weeks, each unit is meticulously produced to ensure timely delivery. Please note that for proper installation, the HIP-E9800-SSB-KIE cup is required and must be purchased separately to provide a secure and stable column connection.
Upgrade your Ecorote 9800 turbine setup with the Hipar STR-ZERDZ-WIROWANA-E16.5-25. Its notable length and load-bearing capacity, paired with superior construction quality, make it an ideal choice for even the most demanding wind turbine projects. מבית OWC – זמין בטאקט טכנולוגיות.
קטגוריה: all
לקבלת הצעת מחיר – צרו קשר.
השאירו פרטים ונחזור אליכם בהקדם
Tact technologies Solutions LTD פועלת בעולמות החומרה וה-IT למעלה מ-15 שנים עם מאות לקוחות מרוצים, מקטנים עד חברות וארגוני ענק.
החברה שמה על דגלה להעניק ללקוחותינו את שירות הלקוחות ברמה הגבוהה ביותר כך שיחד עם פתרונות התוכנה והחומרה הייחודיים שלנו אנו יוצרים שילוב מנצח עבור לקוחותינו שחלקם נמצאים איתנו מהקמת החברה.