The Strain Concrete Pole E13.5/25 (263) is specifically designed for use with the Ecorote 9800 Turbine. This concrete pole measures 13.5 meters in length and can support a load capacity of 25 kN. Delivery for the product is typically within five weeks. Please note that the HIP-E9800-SSB-KIE cup is required for installation or operation.
Introducing the Hipar STR-ZERDZ-WIROWANA-E13,5-25, a premium pre-stressed concrete column engineered specifically for the Ecorote 9800 turbine. With an impressive length of 13.5 meters and a strong load capacity of 25 kN, this column is perfectly suited for supporting large-scale wind turbine installations.
Crafted by Hipar, the STR-ZERDZ-WIROWANA-E13,5-25 utilizes high-strength concrete to guarantee durability and stability over time. Its pre-stressed design enhances its ability to bear heavy loads and endure challenging environmental conditions, providing dependable performance for the Ecorote 9800 turbine.
This column is available with a lead time of up to 5 weeks, ensuring precise manufacturing and delivery. For proper installation on a pre-stressed concrete column, the HIP-E9800-SSB-KIE cup is necessary and must be purchased separately to ensure secure and effective mounting.
Boost the stability and efficiency of your wind turbine setup with the Hipar STR-ZERDZ-WIROWANA-E13,5-25. Its significant load capacity and reliable construction make it an excellent choice for supporting the Ecorote 9800 turbine across various applications. מבית OWC – זמין בטאקט טכנולוגיות.
קטגוריה: all
לקבלת הצעת מחיר – צרו קשר.
השאירו פרטים ונחזור אליכם בהקדם
Tact technologies Solutions LTD פועלת בעולמות החומרה וה-IT למעלה מ-15 שנים עם מאות לקוחות מרוצים, מקטנים עד חברות וארגוני ענק.
החברה שמה על דגלה להעניק ללקוחותינו את שירות הלקוחות ברמה הגבוהה ביותר כך שיחד עם פתרונות התוכנה והחומרה הייחודיים שלנו אנו יוצרים שילוב מנצח עבור לקוחותינו שחלקם נמצאים איתנו מהקמת החברה.