This 13.5-meter reinforced concrete pole is designed with a load capacity of 12kN, making it ideal for use with the Ecorote 2800 Turbine. The package includes the HIP-E1500-2800-SSB cup. Delivery is available within a timeframe of up to five weeks.
Introducing the Hipar STR-ZERDZ-WIROWANA-E13.5-12, a top-tier prestressed concrete column expertly designed for use with the Ecorote 2800 turbine. This column boasts a remarkable length of 13.5 meters, offering a solid foundation ideal for large wind turbine installations. With an impressive load capacity of 12 kN, it delivers outstanding strength and stability, tailored to meet the rigorous structural demands of modern wind turbines, ensuring reliable support and exceptional durability over the long term. The Hipar STR-ZERDZ-WIROWANA-E13.5-12 is available with a lead time of up to 5 weeks, allowing for meticulous manufacturing and quality assurance. Please note that the HIP-E1500-2800-SSB cup is required to complete the installation and is sold separately. Choose the Hipar STR-ZERDZ-WIROWANA-E13.5-12 for a robust and reliable support structure for your Ecorote 2800 turbine, enhancing the performance and lifespan of your wind energy system with superior durability and efficiency. מבית OWC – זמין בטאקט טכנולוגיות.
קטגוריה: all
לקבלת הצעת מחיר – צרו קשר.
השאירו פרטים ונחזור אליכם בהקדם
Tact technologies Solutions LTD פועלת בעולמות החומרה וה-IT למעלה מ-15 שנים עם מאות לקוחות מרוצים, מקטנים עד חברות וארגוני ענק.
החברה שמה על דגלה להעניק ללקוחותינו את שירות הלקוחות ברמה הגבוהה ביותר כך שיחד עם פתרונות התוכנה והחומרה הייחודיים שלנו אנו יוצרים שילוב מנצח עבור לקוחותינו שחלקם נמצאים איתנו מהקמת החברה.