The Ecorote 2800 Turbine E16.5/12 Strain Concrete Pole is designed with a length of 16.5 meters and a load capacity of 12 kN. It ensures efficient delivery within up to 5 weeks. This product requires the HIP-E1500-2800-SSB cup for optimal performance.
Introducing the Hipar STR-ZERDZ-WIROWANA-E16.5-12, a premium pre-stressed concrete column designed specifically for the Ecorote 2800 turbine. Standing at 16.5 meters, this column offers robust support for large-scale wind turbine installations. With a load capacity of 12 kN, it ensures stability and reliability under challenging conditions. Engineered for durability and performance, it is essential for maintaining your wind energy system's integrity. The manufacturing lead time is up to 5 weeks for quality assurance. Installation requires the HIP-E1500-2800-SSB cup, available separately. Choose the Hipar STR-ZERDZ-WIROWANA-E16.5-12 for dependable support for your Ecorote 2800 turbine. מבית OWC – זמין בטאקט טכנולוגיות.
קטגוריה: all
לקבלת הצעת מחיר – צרו קשר.
השאירו פרטים ונחזור אליכם בהקדם
Tact technologies Solutions LTD פועלת בעולמות החומרה וה-IT למעלה מ-15 שנים עם מאות לקוחות מרוצים, מקטנים עד חברות וארגוני ענק.
החברה שמה על דגלה להעניק ללקוחותינו את שירות הלקוחות ברמה הגבוהה ביותר כך שיחד עם פתרונות התוכנה והחומרה הייחודיים שלנו אנו יוצרים שילוב מנצח עבור לקוחותינו שחלקם נמצאים איתנו מהקמת החברה.