Introducing the Hipar STR-ZERDZ-WIROWANA-E18-12, a top-tier pre-stressed concrete column specifically designed for the Ecorote 2800 turbine. With an impressive length of 18 meters, this sturdy column ensures the required elevation and stability for large-scale wind turbine installations. Built to handle a load capacity of 12 kN, the STR-ZERDZ-WIROWANA-E18-12 offers unparalleled support and durability even in the toughest conditions. Its robust construction is vital for maintaining the turbine's operational integrity and ensuring safety. With a lead time of up to 5 weeks, this column exemplifies meticulous production and strict quality assurance. For installation, the HIP-E1500-2800-SSB socket, which is sold separately, is required to ensure correct setup. Opt for the Hipar STR-ZERDZ-WIROWANA-E18-12 as your go-to support solution for the Ecorote 2800 turbine. This pre-stressed concrete column provides superior performance and stability, guaranteeing efficient and safe turbine operation.

18-meter reinforced concrete pole designed specifically for the Ecorote 2800 turbine, with a load capacity of 12kN. Delivery is estimated to take 5 weeks. This product requires the HIP-E1500-2800-SSB cup for installation.

Introducing the Hipar STR-ZERDZ-WIROWANA-E18-12, a top-tier pre-stressed concrete column specifically designed for the Ecorote 2800 turbine. With an impressive length of 18 meters, this sturdy column ensures the required elevation and stability for large-scale wind turbine installations.

Built to handle a load capacity of 12 kN, the STR-ZERDZ-WIROWANA-E18-12 offers unparalleled support and durability even in the toughest conditions. Its robust construction is vital for maintaining the turbine's operational integrity and ensuring safety.

With a lead time of up to 5 weeks, this column exemplifies meticulous production and strict quality assurance. For installation, the HIP-E1500-2800-SSB socket, which is sold separately, is required to ensure correct setup.

Opt for the Hipar STR-ZERDZ-WIROWANA-E18-12 as your go-to support solution for the Ecorote 2800 turbine. This pre-stressed concrete column provides superior performance and stability, guaranteeing efficient and safe turbine operation. מבית OWC – זמין בטאקט טכנולוגיות.

קטגוריה: all

לקבלת הצעת מחיר – צרו קשר.

קטגוריה:

מוצרים דומים

HPE J4858D – Aruba 1G SFP LC SX 500m OM2 MMF Transceiver - טאקט טכנולוגיות
טאקט - פתרונות טכנולוגיים מתקדמים לציוד IT ותקשורת

Contact

השאירו פרטים ונחזור אליכם בהקדם

מחפשים ציוד IT? קבלו הצעת מחיר תוך 24 שעות! בקשו הצעת מחיר 03-7524441 ×
דילוג לתוכן