18-meter reinforced concrete pole designed specifically for the Ecorote 2800 turbine, with a load capacity of 12kN. Delivery is estimated to take 5 weeks. This product requires the HIP-E1500-2800-SSB cup for installation.
Introducing the Hipar STR-ZERDZ-WIROWANA-E18-12, a top-tier pre-stressed concrete column specifically designed for the Ecorote 2800 turbine. With an impressive length of 18 meters, this sturdy column ensures the required elevation and stability for large-scale wind turbine installations.
Built to handle a load capacity of 12 kN, the STR-ZERDZ-WIROWANA-E18-12 offers unparalleled support and durability even in the toughest conditions. Its robust construction is vital for maintaining the turbine's operational integrity and ensuring safety.
With a lead time of up to 5 weeks, this column exemplifies meticulous production and strict quality assurance. For installation, the HIP-E1500-2800-SSB socket, which is sold separately, is required to ensure correct setup.
Opt for the Hipar STR-ZERDZ-WIROWANA-E18-12 as your go-to support solution for the Ecorote 2800 turbine. This pre-stressed concrete column provides superior performance and stability, guaranteeing efficient and safe turbine operation. מבית OWC – זמין בטאקט טכנולוגיות.
קטגוריה: all
לקבלת הצעת מחיר – צרו קשר.
השאירו פרטים ונחזור אליכם בהקדם
Tact technologies Solutions LTD פועלת בעולמות החומרה וה-IT למעלה מ-15 שנים עם מאות לקוחות מרוצים, מקטנים עד חברות וארגוני ענק.
החברה שמה על דגלה להעניק ללקוחותינו את שירות הלקוחות ברמה הגבוהה ביותר כך שיחד עם פתרונות התוכנה והחומרה הייחודיים שלנו אנו יוצרים שילוב מנצח עבור לקוחותינו שחלקם נמצאים איתנו מהקמת החברה.