Reinforced Concrete Pole E15/12 (218) for Ecorote 2800 Turbine – This pole has a length of 15 meters and a load capacity of 12kN. It has a delivery time of 5 weeks and requires the HIP-E1500-2800-SSB Cup.
Introducing the Hipar STR-ZERDZ-WIROWANA-E15-12, a high-quality pre-stressed concrete column crafted for the Ecorote 2800 turbine. With a length of 15 meters, this column is ideal for larger, demanding wind turbine installations.
With a strong load capacity of 12 kN, the STR-ZERDZ-WIROWANA-E15-12 provides exceptional strength and stability. It is engineered for reliable performance under various environmental conditions, enhancing the durability and efficiency of your wind energy system.
The Hipar STR-ZERDZ-WIROWANA-E15-12 has a lead time of up to 5 weeks, ensuring careful manufacturing and rigorous quality checks. Please note that installation requires the HIP-E1500-2800-SSB cup, available separately.
Choose the Hipar STR-ZERDZ-WIROWANA-E15-12 for a reliable and enduring support solution for your Ecorote 2800 turbine. This pre-stressed concrete column is designed for superior performance and steadfast support, ensuring your wind turbine system operates at its best. מבית OWC – זמין בטאקט טכנולוגיות.
קטגוריה: all
לקבלת הצעת מחיר – צרו קשר.
השאירו פרטים ונחזור אליכם בהקדם
Tact technologies Solutions LTD פועלת בעולמות החומרה וה-IT למעלה מ-15 שנים עם מאות לקוחות מרוצים, מקטנים עד חברות וארגוני ענק.
החברה שמה על דגלה להעניק ללקוחותינו את שירות הלקוחות ברמה הגבוהה ביותר כך שיחד עם פתרונות התוכנה והחומרה הייחודיים שלנו אנו יוצרים שילוב מנצח עבור לקוחותינו שחלקם נמצאים איתנו מהקמת החברה.