Product Description: The E15/15 Concrete Pole is designed for use with the Ecorote 5000 Turbine. It features a length of 15 meters and a load capacity of 15 kilonewtons. This product comes with a delivery time of five weeks. Please note that it requires the HIP-E5000-SSB-KIE Cup for installation.
The Hipar STR-ZERDZ-WIROWANA-E15-15 is a premium pre-stressed concrete column, expertly crafted to support the Ecorote 5000 turbine. Measuring 15 meters in length with a load capacity of 15 kN, this column is designed to deliver optimal support and stability for your wind turbine installation.
Constructed by Hipar, the STR-ZERDZ-WIROWANA-E15-15 features top-tier pre-stressed concrete, ensuring outstanding durability and resistance against diverse environmental conditions. Its robust design maintains the structural integrity necessary for large-scale turbine systems.
For proper installation, the HIP-E5000-SSB-KIE socket, available separately, is required. This component ensures secure mounting and attachment of the concrete column, essential for stable and efficient turbine operation.
With a lead time of up to 5 weeks, the STR-ZERDZ-WIROWANA-E15-15 delivers reliability and strength, making it an essential component for maximizing the performance and stability of your Ecorote 5000 turbine system. מבית OWC – זמין בטאקט טכנולוגיות.
קטגוריה: all
לקבלת הצעת מחיר – צרו קשר.
השאירו פרטים ונחזור אליכם בהקדם
Tact technologies Solutions LTD פועלת בעולמות החומרה וה-IT למעלה מ-15 שנים עם מאות לקוחות מרוצים, מקטנים עד חברות וארגוני ענק.
החברה שמה על דגלה להעניק ללקוחותינו את שירות הלקוחות ברמה הגבוהה ביותר כך שיחד עם פתרונות התוכנה והחומרה הייחודיים שלנו אנו יוצרים שילוב מנצח עבור לקוחותינו שחלקם נמצאים איתנו מהקמת החברה.