Introducing the Hipar STR-ZERDZ-WIROWANA-E15-25, a high-quality pre-stressed concrete column specifically designed for the Ecorote 9800 turbine. With a significant length of 15 meters and a load capacity of 25 kN, this column offers outstanding support and stability for large-scale wind turbine installations. Manufactured by Hipar, this column incorporates advanced pre-stressing technology to enhance its strength and durability. This ensures it can efficiently manage substantial loads and endure challenging environmental conditions, making it a dependable option for supporting turbines. The STR-ZERDZ-WIROWANA-E15-25 has a manufacturing lead time of up to 5 weeks, ensuring precise production and timely delivery. For proper installation on this pre-stressed concrete column, the HIP-E9800-SSB-KIE socket is necessary. Sold separately, it ensures a secure and stable mounting for the turbine. Enhance the performance and reliability of your Ecorote 9800 turbine system with the Hipar STR-ZERDZ-WIROWANA-E15-25. Its strong construction and impressive specifications make it an ideal choice for supporting large wind turbines across various environments.

E15/25 Reinforced Concrete Pole designed for the Ecorote 9800 Turbine. This pole has a length of 15 meters and a load capacity of 25 kN. Delivery is available within 5 weeks. Please note that the HIP-E9800-SSB-KIE Cup is required for installation.

Introducing the Hipar STR-ZERDZ-WIROWANA-E15-25, a high-quality pre-stressed concrete column specifically designed for the Ecorote 9800 turbine. With a significant length of 15 meters and a load capacity of 25 kN, this column offers outstanding support and stability for large-scale wind turbine installations.

Manufactured by Hipar, this column incorporates advanced pre-stressing technology to enhance its strength and durability. This ensures it can efficiently manage substantial loads and endure challenging environmental conditions, making it a dependable option for supporting turbines.

The STR-ZERDZ-WIROWANA-E15-25 has a manufacturing lead time of up to 5 weeks, ensuring precise production and timely delivery. For proper installation on this pre-stressed concrete column, the HIP-E9800-SSB-KIE socket is necessary. Sold separately, it ensures a secure and stable mounting for the turbine.

Enhance the performance and reliability of your Ecorote 9800 turbine system with the Hipar STR-ZERDZ-WIROWANA-E15-25. Its strong construction and impressive specifications make it an ideal choice for supporting large wind turbines across various environments. מבית OWC – זמין בטאקט טכנולוגיות.

קטגוריה: all

לקבלת הצעת מחיר – צרו קשר.

קטגוריה:

מוצרים דומים

HPE J4858D – Aruba 1G SFP LC SX 500m OM2 MMF Transceiver - טאקט טכנולוגיות
טאקט - פתרונות טכנולוגיים מתקדמים לציוד IT ותקשורת

Contact

השאירו פרטים ונחזור אליכם בהקדם

מחפשים ציוד IT? קבלו הצעת מחיר תוך 24 שעות! בקשו הצעת מחיר 03-7524441 ×
דילוג לתוכן