The E18/25 Reinforced Concrete Pole is specifically designed for the Ecorote 9800 Turbine. It measures 18 meters in length and boasts a load capacity of 25 kN. Delivery of this product is estimated to take five weeks. Please note that it requires the HIP-E9800-SSB-KIE cup for proper installation.
Introducing the Hipar STR-ZERDZ-WIROWANA-E18-25, a top-tier pre-stressed concrete column specifically engineered for the Ecorote 9800 turbine. With an impressive length of 18 meters and a robust load capacity of 25 kN, this column is perfect for supporting large-scale wind turbine installations across diverse environments. Expertly crafted by Hipar, the STR-ZERDZ-WIROWANA-E18-25 incorporates cutting-edge pre-stressing technology, offering exceptional strength and durability. This design ensures the column can handle substantial loads and resist harsh weather conditions, thereby enhancing the stability and reliability of your turbine system. The STR-ZERDZ-WIROWANA-E18-25 is available for delivery with a lead time of up to 5 weeks, guaranteeing careful production and timely arrival. For installation, the HIP-E9800-SSB-KIE socket is required, which must be purchased separately to ensure a secure and stable connection for the pre-stressed concrete column. Elevate your Ecorote 9800 turbine installation with the Hipar STR-ZERDZ-WIROWANA-E18-25. Its impressive length and load-bearing capacity, coupled with superior construction, make it a prime choice for demanding applications. מבית OWC – זמין בטאקט טכנולוגיות.
קטגוריה: all
לקבלת הצעת מחיר – צרו קשר.
השאירו פרטים ונחזור אליכם בהקדם
Tact technologies Solutions LTD פועלת בעולמות החומרה וה-IT למעלה מ-15 שנים עם מאות לקוחות מרוצים, מקטנים עד חברות וארגוני ענק.
החברה שמה על דגלה להעניק ללקוחותינו את שירות הלקוחות ברמה הגבוהה ביותר כך שיחד עם פתרונות התוכנה והחומרה הייחודיים שלנו אנו יוצרים שילוב מנצח עבור לקוחותינו שחלקם נמצאים איתנו מהקמת החברה.